Benchmark Metropolis DGT 25 BF Installation And Servicing Instrucnion page 26

Table of Contents

Advertisement

ENG
IT
Failure to install and commission according to the manufacturer's instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty. This
ES
does not affect the customer's statutory rights.
If yes, and if required by the manufacturer, has a water scale reducer been fitted?
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer's instructions and/or BS5546/BS6798
Yes
If the condensate pipe terminates externally has the pipe diameter been increased and weatherproof insulation fitted?
Yes
26

Advertisement

Table of Contents
loading

Table of Contents