Page 1
FGM 160 Maintenance Procedure Scope: ISO 9001:2008 §7.2.3 Additional Information (when applicable) 2014.03.25 Procedure updated Removed from User Manual, updated: 2013.01.25 changes in text formatting Issued for Fluenta release; moved to 2008.04.15 DIÅ User Manual Rev. Review Issue date Reason for issue...
Page 2
FGM 160 Maintenance Procedure TABLE OF CONTENTS 1. Purpose ..................... 3 2. Abbreviations ..................3 3. General ....................3 4. Field Computer Unit ................3 4.1 Connectors .................. 3 4.2 Field Computer Preventive Maintenance ........... 3 4.2.1 Inspection for Damages ............3 4.3 Functional Check ................
Page 3
The following should be carried out every twelve months: 4.2.1 Inspection for Damages Inspect the FGM 160 housing for damages. Make sure that the EEx-e housing drain is operating correctly and that there is no contamination on the inside. 4.3 Functional Check...
Page 4
8 x D) and ensure that there is no contact between the cables and sharp edges that can cause damages. Interfering equipment in the surroundings must be kept in a safe distance from the cables and the rest of the FGM 160 equipment. 64.120.001...