Enersol Pool Panel Installation Guide
SOLAR PANEL INSTALLATION
INFORMATION
If for any reason whatsoever, the installer of this
product does not feel comfortable and/or safe do
not proceed with the installation. The installation of
this product involves walking on the roof as well as
climbing ladders. Do not attempt unless you
understand all safety procedures involved with
power tools, climbing ladders and working on roofs.
To obtain ladder safety, roof safety and power tool
safety procedures, contact your local Hardware or
Building Supply Company and State or Provincial
Worker's Safety Board.
The installation of Enersol Solar Panels may be
performed on a low pitched (less than 12:12 or 45
degrees angle) shingle and some types of metal
roofs. If an installation varies from these types,
Enersol should be advised and asked for special
installation instructions, visit our website or contact
your roof manufacturer. For example, on a flat roof
installation, we do not advise cutting into the roof or
drilling lag bolts into the roof.
EnerWorks Inc., its agents, distributors
and sales representatives of the Enersol
solar products are in no way responsible if
safety procedures, installation instructions and
common sense are not followed, or if EnerWorks
is not consulted should an unusual problem
arise. EnerWorks assumes no liability for
installation, parts or labor. If for any reason, you
question the installation instructions, DVD,
safety procedures and/or installation locations,
do
not
proceed,
immediately at: 1-800-884-6444.
Remember... SAFETY FIRST!
and
contact
EnerWorks
PANEL BOX
4 sections with pre attached headers
8 clips
10 lag bolts
8 O-rings
3 long straps (48")
4 short straps (12")
TOOLS REQUIRED
Ladder, Safety gear (safety glasses, fall arrest, and
boots), Variable speed drill, 5/16" and 3/8" socket
drivers, Level, Hacksaw, Chalk line, Utility knife,
Caulking gun, Various tools (pliers, etc.)
SYSTEM KIT
(Purchased separately – 1 per install)
1 warranty card
1 installation guide/owner's manual
1 Enersol installation DVD
1 orange installation tool
1 tube lag bolt roof sealant
1 tube O ring lubricant
2 end caps
2 O rings
ADDITIONAL PARTS REQUIRED
PVC heavy bodied cement
1 ½" - 2" elbows
1 ½" - 2" tees
1 ½" – 2" pipe
pipe hold downs (1 ½" and/or 2")
1 ½" – 2" couplers
Extra lag bolts
3-way manual valve or
Automatic controller with 3-way valve
One way check valve
1 ½" – 2" ball valve
Teflon tape
3 |
P a g e
Need help?
Do you have a question about the Pool Panel and is the answer not in the manual?