Installation Clearances - andrews WHC56 Installation And Service Manual

Condensing gas water heater
Hide thumbs Also See for WHC56:
Table of Contents

Advertisement

6.

Installation Clearances

Before installing, check for the following:
The appliance must be installed in a suitably ventilated room, in accordance with the regulations
in force.
Install in accordance with relevant building and mechanical codes, as well as any local, state or
national regulations.
Item
• Maintain the following clearances
from both combustible and
non-combustible materials.
• If possible, leave 200mm or more
on either side of the unit to facilitate
inspection.
• If possible, leave 600mm or more
in front of the unit to facilitate main-
tenance and service if necessary.
• There must be a clearance of 600mm
or more in front of the flue terminal.
• This restriction will not be applied
to an area where an effective
shield makes a clearance of
600mm or more in front of the
exhaust outlet.
8
Check
45 mm
or more
Distance from
the top surface
200mm
or more
Caution
Illustration
10 mm
45 mm
or more
or more
Distance from
Distance from
the side
the back surface
200mm
or more
600mm
or more
There must be no
300mm
building opening
or more
within this area.
Flue Terminal
300mm
or more
300mm
300mm
or more
or more
Consult the flue
manufacturer for
clearances

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lwhc5

Table of Contents