Dimensions - Palm GH Installation And Operation Manual

Water source geothermal heating & cooling heat pump
Table of Contents

Advertisement

5 Installation
.4
5

Dimensions

GH 11 GH 15 GH 17 GH 30
-
-
H1
H2
5 4 Installation position
.
1 The unit is recommended to be installed in basement kitchen or other place indoor.
2 Drain ditch or other facilities should be arranged under the unit, to avoid the environment influence because of
water discharge.
3
To install the unit at balcony or top of building, the installation site must meet the allowable bearing capacity of
building structure, without affecting the structural safety.
4
The unit should not be installed at places accompanied with oil, inflammable gases, corrosive components e.g.
sulfur compound, or high-frequency equipment.
5
The unit must be installed upon reliable machine base or framework. Weight capacity of framework should be 3
times of the body weight, and safeguard measures should be taken to avoid malfunction of fastenings.
6
The unit should not be installed at sites with typhoon/ earthquake hazards. Midair installation should be
avoided as much as possible, for machine falling may result in severe accident.
-
-
Installation must be carried out by professional
personnel.
Note!
,
15
ITEM
A
400
B
650
H1
960
760
H2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oh

Table of Contents