Toshiba MMY-MAP0806HT8(J)P Service Manual page 245

Hide thumbs Also See for MMY-MAP0806HT8(J)P:
Table of Contents

Advertisement

N
. o
P
a
t r
o t
b
e
e r
p
a l
c
e
d
4
Inverter assembly
W
o
k r
p
o r
WARNING
Wear a pair of gloves.
Otherwise, you will risk an injury involving a
replacement part or some other object.
1. Detachment
1) Stop the air conditioner operation, and turn off
the circuit breaker.
2) Remove the inverter cover.
(M4 × 10, 2 pcs.)
3) Remove the wiring.
(e.g. the power supply wire, compressor leads,
coils, sensors and heaters)
4) Steps only applicable to a 14, 16HP unit
• Remove the reactor lead cover.
(M4 × 10, 1 pc.)
• Remove the screws securing the box.
(M4 × 10, 1 pc.)
• Detach the reactor leads.
(4 terminal block bolts)
5) Remove the screws securing the box.
(M5 × 10, 1 pc. each for top and bottom)
In the case of a 14, 16, 18, 20, 22HP unit:
M5 × 10, 3 pcs. for top and 2 pcs for bottom
6) Disengage the hook by gently pressing down the
locking lever with your finger.
(The lower part of the box moves forward.)
7) Hold the top board with both hands to disengage
the top hook.
2. Attachment
Carry out installation by following the dismantling
procedure in reverse (7)
Before pushing the lower part in, pull the reactor leads
out. Take care so that the wiring does not get caught
in the way.
Reconnect all the wiring.
c
e
d
u
e r
1)).
− 244 −
R
e
m
a
k r
s
4) Screw (with arrow mark)
Removable design
4) Reactor
lead cover
4) Reactor
terminal block
4) Fan2 (right side)
5) Screw
5) Screws with
arrow mark
(2 locations)
7)
Pull it forward
Before pushing lower part in, pull
leads out through hole.
When pushing lower part in, be sure
to keep wiring out of way.
4) Screw
(with arrow
mark)
4) ) Fan1 (left side)
Locking lever

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents