Panasonic SA-PM27E Service Manual page 98

Hide thumbs Also See for SA-PM27E:
Table of Contents

Advertisement

file:///C|/Documents%20and%20Settings/Administrator/Plocha/PANASONIC%20SA-PM27E/s0913010000.htm
3. Check the phase.
A. The projecting portion of a dividing lever (2) should be inserted into a concave portion of a
dividing lever (a).
B. Seta loading gear at the position shown by figure 2.
C. The hole A of pitch plate should be positioned at a hole of a main gear. (Figure 3)
D. The hole B of pitch plate should be positioned at a hole of a speedup gear. (Figure 4)
E. Set the bottom rib of a tray drive gear to be level. (Figure 5)
file:///C|/Documents%20and%20Settings/Adminis...r/Plocha/PANASONIC%20SA-PM27E/s0913010000.htm (21 of 26) [14.6.2003 18:36:37]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sa-pm27ebSa-pm27eg

Table of Contents