Renew the resources assignment for the variables. This can be done manually or automati-
cally.
The global system variables for the previously non-redundant resources, which have been
used in programs or pictures, still have the previous resource allocation in the Variables List.
The resource allocations must be changed to a possible new resource name.
These now undefined Identifiers are reported as errors in the plausibility check.
In the hardware structure the individually exported blocks of the process stations must now be
imported into a redundant process station so that all the information on insertion and I/O com-
ponents becomes available once more.
When a rack-based process station PS is changed into a redundant FieldController AC
800FR, the I/O modules must be imported individually as a block underneath the CAN-
Master DNETP.
Allocate the redundant resource to the redundant process station
Plausibility check the project
Gross Automation, 1725 South Johnson Road, New Berlin, WI 53146, www.ssacsales.com, 800-349-5827
50
ABB FieldController 800

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents