Assembling Of The Lever (Sub Gear Back L) - Sony HCD-HPX9 Service Manual

Hide thumbs Also See for HCD-HPX9:
Table of Contents

Advertisement

QQ
3 7 63 1515 0

4-8. ASSEMBLING OF THE LEVER (SUB GEAR BACK L)

1 Turn over the stocker assy
in the direction of the arrow.
PRECAUTION DURING GEAR
(SUB GEAR PIN LEFT) INSTALLATION
gear (sub gear pin left)
TE
L 13942296513
www
.
http://www.xiaoyu163.com
2 Adjust phases.
gear (stock rotary left)
4 washers (5.5)
3 gear (sub gear pin left)
UPPER
SIDE
x
ao
u163
y
i
http://www.xiaoyu163.com
2 9
8
PRECAUTION DURING SPR-T
(SUB GEAR BACK L) INSTALLATION
lever (sub gear back L)
gear (sub gear pin left)
sub gear (joint just front)
0 screw (M2 × 5)
9 cover (L)
8 SPR-T
(sub gear back L)
Q Q
3
6 7
1 3
1 5
6 lever (joint just front)
co
.
HCD-HPX9
9 4
2 8
gear (stock rotary left)
SPR-T (sub gear back L)
qa k tapping screw
(2.6 × 8)
7 lever
0 5
8
2 9
9 4
2 8
(sub gear back L)
5 gear (stock joint),
shaft (stock)
m
9 9
9 9
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcd-hpx10w

Table of Contents