Installation Guide - Noritz N-063 Owner's Manual And Installation Manual

Hide thumbs Also See for N-063:
Table of Contents

Advertisement

Remote controller and attached set
Part Nos.
Part Names
750
RC-7646M body USA QME
751
Remote controller dressed frame NR-AS QKS
752
Cross recessed round wood screw 4.1X25
754
Oar plug 6X25
755
Wall packing QHU
770
Remote controller cord S attachment SET EAU
771
Cross recessed round-head type 1 tapping screw 5X35
800
GQ-2423WA-H USA packing P SET-V
888
Instruction manual GQ-2423WA-H America
36

Installation Guide

Order Nos.
Q'ty/unit
QMEJ001
1
QKSA031
1
QHUA115
1
WARNING:
causing property damage, personal injury or death.
Injuries and damage due to accidents during installation are divided into the following categories.
EAUM001
1
Closely observe indications of these three categories. It is critical to your safety.
SBE7834
1
SAQ8705
1
Requests to installers
• Failures and damage caused by erroneous work or work not as instructed in this manual are not
• Check that the installation was done properly in accordance with this Installation Guide upon completion
• Please put your information on the warranty card in the operation manual and give it to the customer
Installation must conform with local codes, or in the absence of local codes, the National Fuel Gas
Code, ANSI Z223.1/NFPA 54.
GAS WATER HEATER
N-063
(Indoor or Outdoor Installation)
If the information in this manual is not followed exactly, a fire or explosion may result
Ignoring this indication may cause an immediate danger of death or serious
Danger
injury due to incorrect handling of the water heater.
Ignoring this indication may result in death or serious injury due to incorrect
Warning
handling of the water heater.
Ignoring this indication may result in serious injury or physical damage due to
Caution
incorrect handling of the water heater.
General
Pull out
Prohibition
power plug
• In order to use the water heater safely, read this installation manual carefully,
Caution
and follow the installation instructions.
covered by the warranty.
of the installation work.
when installation is completed.
NORITZ AMERICA CORPORATION
Be sure to
Be sure to do
ground
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents