GE CSB9120 Installation Instructions Manual page 6

Advantium 120v built-in speedcook ovens
Table of Contents

Advertisement

Available languages

Available languages

IMPORTANT:
Always maintain 36-3/4" minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.
PREPARE THE OPENING
Installation over a GE Applainces/
Monogram Oven:
30"
17-1/2"
45-1/4"
Min.
* If you are replacing a GE Appliances/
Monogram electric double oven with the
combined installation of an Advantium 120 and
a single oven, use the dimensions shown. The
middle rail separating the two openings may
need to be larger than the 2" minimum shown.
Standard Installation Preparation
(CONT.)
Construct
23-1/2"
solid bottom
- Min. 3/8"
plywood
supported
on all four sides.
Must be able to
support weight
25-1/4"
of oven and
contents.
2" Min.
(3" Recommended)
Per Oven
Requirement
PREPARE THE OPENING
Installation over a GE Appliances/
Monogram Oven and Warming Drawer:
30"
17-1/2"
45-1/4"
NOTE: Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location does not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
capable of supporting the cabinet load, in
addition to the added weight of the oven and
drawer, plus additional oven loads.
6
(CONT.)
Construct
solid bottom -
23-1/2"
Min. 3/8" plywood
supported
on all four sides.
Must be able to
support weight
25-1/4"
of oven and
contents.
2" Min.
(3" Recommended)
Per Oven
Requirement
2" Min.
(3" Recommended)
Per Warming
Drawer
Requirement
For personal safety, the
mounting surface must be

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Zsc1202Psb9120Zsc1201

Table of Contents