Product Dimensions And Clearances; Advance Planning; Preparing The Opening (Standard); Preparing The Opening (Flush Mount) - GE CSB9120 Installation Instructions Manual

Advantium 120v built-in speedcook ovens
Table of Contents

Advertisement

Available languages

Available languages

PRODUCT DIMENSIONS AND CLEARANCES

21-1/2
1-3/5
1
TOOLS AND PARTS REQUIRED
)
(NOT SUPPLIED
• #2 Phillips screwdriver
• Hand-held drill
• High speed drill bit, 3/32 diameter
• 3/8 slot-head screwdriver
• Level
• Saw
• 3/8 min. plywood for floor (if required)
• Wood screws or other hardware for installing
runner or shelf to support oven (if required)
• Safety glasses or goggles
Design Information
1-1/10
13
NOTE: Appearance will vary by model.

ADVANCE PLANNING

wide oven cabinet with standard installation.
• Cutout height dimensions are different for
installations with an accessory storage drawer.
Make sure to use the correct cutout when
preparing the opening.
• Allow for clearance to adjacent corners, walls,
drawers, etc.
The oven must be securely installed in a cabinet
that is firmly attached to the house structure.
Weight on the oven door could cause the oven
to tip and result in injury. Never allow anyone to
climb, sit, stand or hang on the oven door.
If installing the drawer accessory, the drawer
must be assembled to the oven prior to
installation into the cabinet. See the Accessory
Storage Drawer Assembly Instructions.
FLUSH MOUNT INSTALLATION
(Monogram Only)
This installation method allows for the unit face to
be inline with the cabinet face.
IMPORTANT
: HIGH SKILL LEVEL IN
CARPENTRY IS REQUIRED. Non-standard
cabinetry may be required.
Flush installation of the oven will lead to the
exposure of the cabinet face frame edges.
Side cleats may be visible and should be a
finished surface.
3
29-3/4
19

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Zsc1202Psb9120Zsc1201

Table of Contents