Samsung KXWD Series Installation Manual page 81

Table of Contents

Advertisement

AM✴✴✴HXWAF✴ / AM✴✴✴HXWAJ✴
You cannot collect the entire refrigerant in the system at once during pump down operation. Therefore you must collect
additional refrigerant into the empty refrigerant container prior to pump down operation.
1. Connect a refrigerant container to an outdoor unit as shown in the illustration and operate about 50 % of the indoor units
in cooling mode.
2. When the pressure on the high pressure side is over 2.94 MPa (426 psi), decrease the number of operating indoor unit.
3. Open the manifold gauge (that is connected to the liquid side service valve) and the valve on the refrigerant container to
collect refrigerant.
Liquid pipe (Flare installation)
High pressure gas pipe
Low pressure gas pipe
Refrigerant must be collected prior to pump down operation.
Make sure that amount of collecting refrigerant does not exceed capacity of the refrigerant container.
CAUTION
Refer to service manual for detail instruction.
Manifold gauge
Filling port
ENGLISH-81
Refrigerant
container
Scale

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hxwa series

Table of Contents