18.1
LIFTING PLAN
A. lifting slings
B. Bers
The position of the lifting slings is shown in the pictogram below:
Handling, transport
Note: Measurements are expressed in mm.
230
Dock and Go version: it is imperative to
engage forward gear for several seconds to
position the engine base of the boat correctly
under the crane before stopping the boat's
engine.
146876
Index F