Installation - Daikin RKS25BVMB Techical Data

Split sky air
Hide thumbs Also See for RKS25BVMB:
Table of Contents

Advertisement

10

Installation

RKS25,35B
Model
Max. allowable length
Max. allowable height
Additional refrigerant required
for refrigerant pipe exceeding
10 m in length.
Gas pipe
Liquid pipe
* Be sure to add the proper amount of additional refrigerant.
Failure to do so may result in reduced performance.
In sites with poor drainage, use block bases for outdoor
unit. Adjust foot height until the unit is leveled. Otherwise,
water leakage or pooling of water may occur.
• Pair Application • R-410A • RKS25-35-50-60-71BVMB
Outdoor unit installation drawings
25 / 35 class
Cooling only: 25m
Heat pump: 15m
15m
20 g/m
O.D. 9.5 mm
O.D. 6.4 mm
Foot bolt-hole
centres
From unit's side
• Split - Sky Air • Outdoor Units
Wrap the installation pipe with the finishing
How to remove the service lid.
+ This service lid is an open/close type.
+ Slide the lid downward to remove it.
How to attach the service lid.
+ Insert the upper part of the service lid into the
250 mm from wall
+ Tighten the screws.
Foot bolt-hole
centres
Allow space for piping and electrical servicing.
Where there is a danger of the unit falling, use foot bolts, or
wires.
tape from bottom to top
Service lid
outdoor unit to install.
10
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rks50bvmbRks60bvmbRks35bvmbRks71bvmb

Table of Contents