UTICA BOILERS UB90-125 Installation, Operation & Maintenance Manual page 32

Gas-fired, direct vent, condensing, hot water boiler
Table of Contents

Advertisement

12 - DETAILED SEQUENCE OF OPERATION
End Of Normal Sequence Of Operation
Thermostat ends call for heat.
Gas valve and circulator pump are
de-energized, valve and flame lights go out.
Blower runs for 30 seconds post purge,
purge light is on.
Blower is de-energized after 30 seconds,
purge light shuts off.
Boiler stand by for next call for heat.
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ub90-200Ub90-150Ub90-175

Table of Contents