Condensate Drain Requirements
Pitch condensate drain line down to floor drain at
minimum of ¼" per foot (21mm/m). External condensate
pump (not furnished) may be used if floor drain is not
available. Condensate pump must be designed for flue gas
condensate application.
Condensate trap is proved with boiler.
Build condensate trap in the field. See Figure 7.
1.
Wood frame or blocks may be used to raise boiler
2.
to maintain drain pitch or to be above external
condensate pump reservoir.
115 volt AC receptacle provided on service switch
3.
junction box which is located at boiler right side,
to provide power for external condensate pump (if
needed).
Condensate Drain Piping
• Condensate trap is to be field installed as shown in
Figure 7
.
• Provided are ½" PVC fittings for condensate drain trap
(assembled in field).
• The ½" diameter schedule 40 PVC condensate drain
piping and pipe fittings must conform to ANSI standards
and ASTM D1785 or D2846.
• Schedule 40 PVC cement and primer must conform
to ASTM D2564 or F493. In Canada, use CSA or ULC
certified schedule 40 PVC drain pipe and cement.
Figure 8 - Condensate Trap and Vent
1/2" PVC Piping 12" Long
To Condensate Drain (Field Supplied)
1/2" PVC Tee
1/2" PVC Piping 3 3/4" Long
1/2" PVC Piping 2" Long
4 - NEAR BOILER PIPING
• Condensate pump with reservoir (not furnished) may
be used to remove condensate to drain line (sanitary
line) above boiler if floor drain is not available or is
inaccessible
Filling Condensate Trap With Water
Manually fill condensate trap at initial start up with water
Following steps are required to fill condensate trap for
start up. Steps are only required at initial start up or if
maintenance requires draining of condensate trap:
Pour about 1 cup of cold tap water into condensate trap
1.
vent.
Excess water will go through condensate drain line.
2.
Verify proper operation of drain line (and external
condensate pump if used).
Chilled Water Piping
Install boiler used in connection with refrigeration system,
so chiller medium is piped in parallel with boiler with
appropriate valves to prevent chilled medium from entering
boiler.
Boiler piping system of hot water boiler connected to
heating coils located in air handling units where they may
be exposed to refrigerated air circulation must be equipped
with flow control valves or other automatic means to
prevent gravity circulation of boiler water during cooling
cycle.
To Exhaust Vent
(2" CPVC)
1/2" PVC Piping 3 3/4" Long
1/2" PVC Elbow
12
½" Adapter
Male NPT x Socket
Weld PVC Piping
1 3/8" Long
To Boiler Flue Outlet (2" CPVC)
2" Male x 2" NPT Male PVC Bushing
2" NPT Male PVC Bushing
1/2" PVC Elbow

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ub90-200Ub90-150Ub90-175

Table of Contents