UTICA BOILERS UB90-125 Installation, Operation & Maintenance Manual page 20

Gas-fired, direct vent, condensing, hot water boiler
Table of Contents

Advertisement

Installation
Recommend all pipes be cut, prepared, and pre-
1.
assembled before permanently cementing any joint.
Rigid supports cause excess noise in vent piping.
2.
Attach combustion air intake piping to supplied 2"
3.
coupling on CVI gas valve. Attach vent piping to
furnished 2" CPVC vent tee on draft inducer outlet.
All pipe joints are to be water tight.
4.
Working from boiler to outside, cut pipe to required
5.
length(s).
Deburr inside and outside of pipe. Remove all chips and
6.
shavings.
Chamfer outside edge of pipe for better distribution of
7.
primer and cement.
Clean and dry all surfaces to be joined.
8.
Check dry fit of pipe and mark insertion depth on pipe.
9.
After pipes have been cut and pre-assembled, apply
10.
cement primer to pipe fitting socket and end of pipe to
insertion mark. Quickly apply approved cement to end
of pipe and fitting socket (over primer). Apply cement
in light, uniform coat on inside of socket to prevent
buildup of excess cement. Apply second coat.
While cement is still wet, insert pipe into socket with
11.
¼ turn twist. Be sure pipe is fully inserted into fitting
socket.
Wipe excess cement from joint. Continuous bead of
12.
cement will be visible around perimeter of properly
made joint.
Handle pipe joint carefully until cement sets.
13.
Support combustion air and vent piping minimum of
14.
every 5 feet using pre-formed metal hanging straps. Do
not rigidly support pipes. Allow for movement due to
expansion and contraction.
Slope combustion air and vent pipes toward boiler
15.
minimum of ¼" per linear foot with no sags between
hangers.
Use appropriate methods to seal openings where vent
16.
and combustion air pipes pass through roof or side
wall.
7 - COMBUSTION AIR AND VENT PIPE
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ub90-200Ub90-150Ub90-175

Table of Contents