Cable Diagrams - ProForm G880 PFEVBE4805.0 User Manual

Home gym
Table of Contents

Advertisement

CABLE DIAGRAMS

The cable diagrams below show the proper routing of the Lat Cable (81), the Low Cable (82), and the Butterfly
Cable (83). Use the diagram to make sure that the cables and the cable traps have been assembled correctly. If
the cables have not been correctly routed, the weight bench will not function properly and damage may occur.
The numbers show the correct order that each cable is routed. Make sure that the cable traps do not touch
or bind the cables.
Butterfly Cable (83)
Length: 1.25m
4
2
5
1
3
2
Low Cable (82)
Length: 5.59m
1
4
2
1
Lat Cable (81)
Length: 3.16m
3
4
5
5
3
22
6. Insert the Backrest Bracket (7) through the slot in
the Bench Frame (1) and under the Adjustment
Lever (11). Make sure that the M10 x 62mm
Flat Head Screw (27) is under the Backrest
Bracket.
Apply grease to an M10 x 168mm Bolt (109).
Attach the Backrest Tubes (8) to the Bench
Frame (1) with the Bolt, two M10 Washers (99),
and an M10 Nylon Locknut (97). Do not over-
tighten the Locknut; the Backrest Tubes must
be able to pivot easily.
7. Attach the Bench Frame Bumper (135) to the
Bench Frame (1) with an M4 x 16mm Screw
(107).
Attach the Backrest (14) to the Backrest Tubes
(8) with four M6 x 38mm Screws (102) and four
M6 Washers (101).
Tighten the four M10 Nylon Locknuts (97)
used in step 5.
8. Attach the Seat (15) to the Bench Frame (1) with
an M6 x 63mm Screw (103), an M6 Washer
(101), and two M6 x 16mm Screws (104).
6
8
97
99
27
1
99
109
11
7
Grease
7
14
8
107
135
1
101
102
101
101
102
8
15
1
101
103
104
7

Advertisement

Table of Contents
loading

Table of Contents