Installing the boiler and making all connections
Gas connection
A Gas connection: ½" BSP
Installing water fittings
Combi boiler
A Heating flow: 722 mm
Installation sequence
(cont.)
1. Connect the gas supply to the gas
inlet connection on the gas cock
A. Upon completion, tighten the
union connection.
2. Carry out a gas soundness test.
3. Purge the gas supply pipe.
B DHW: 715 mm
33