Wiring Diagrams - Master MH-400T-KFA User Manual – Operating Manual

Hide thumbs Also See for MH-400T-KFA:
Table of Contents

Advertisement

NEVER LEAVE HEATER
UNATTENDED WHILE BURN-
ING OR WHILE CONNECTED
TO A POWER SOURCE
Maintenance (Continued)
3. Allow the heater to attempt ignition for 3-5 seconds, during
which time you may hear a loud "grinding" or vibration sound.
4. If your heater has not ignited, re-start the ignition sequence.
Once the heater has ignited, turn the Air Vent Screw clockwise
until fully hand-tightened. See Figure 15.
Any air trapped in the fuel pump will have been purged.
5. Your heater is now ready for operation.
6. Re-fill your heater with fuel before it runs out. This will prevent
the fuel lines and fuel pump from drawing in air and having to
go through the air bleeding procedure again.
Wiring Diagram
©2014 Pinnacle Products International, Inc. Kerosene Heater User's Manual
Figure 15 – Tightening Air Vent Screw
Kerosene
Forced Air Heaters
Page 11

Advertisement

Table of Contents
loading

Table of Contents