Download Print this page

Carrier 58MTA Installation, Start-Up, And Operating Instructions Manual page 10

Direct vent condensing gas furnace

Advertisement

PLUG
AUXILIARY
"J" BOX "__
BOX
DRAIN TUBE
(BLUE AND WHITE STRIPED)
CONDENSATE
TRAP
COLLECTOR BOX
TUBE(GREEN)
BOX EXTENSION
DRAIN TUBE
COLLECTOR
BOX
EXTENStON
TUBE
;ERHOUSING
DRAINTUBE(VIOLET)
DRAIN TUBE (BLUE)
DRAIN TUBE COUPLING
\
\
COLLECTOR BOX TUBE (PINK) "_"
RELOCATE TUBE BETWEEN
BLOWER SHELF AND INDUCER HOUSING FOR
040, 060, AND 080 HEATING INPUT FURNACES
A01029
Fig. 10--Horizontal
Left Tube Configuration
5. Fill unused condensate
trap casing holes with plastic filler
caps (factory-supplied
in loose parts bag).
CONDENSATE
TRAP
TUBING
NOTE:
See Fig. 10 or tube routing
label on main furnace
door to
check for proper
connections.
1. Collector
Box Drain
Tube
a. Install
drain tube coupling
(factory-supplied
in loose parts
bag) into collector
box drain
tube tblue
label)
which
was
previously
connected
to condensate
trap.
b. Connect
large
diatueter
drain
tube
and
clamp
(factory-
supplied
in loose parts bag) to drain tube coupling,
extend-
ing collector
box drain
tube.
c. Route extended
tube (blue label) to condensate
trap and cut
to appropriate
length.
d. Clamp
tube to prevent
any condensate
leakage.
2. Inducer
Housing
Drain
Tube
a. Remove
and disc,'u-d LOWER
(molded)
inducer
housing
drain
tube which
was previously
connected
to condensate
trap.
b. Use inducer
housing
drain extension
tube (violet
label and
factory-supplied
in loose
parts
bag)
to connect
LOWER
inducer
housing
drain
connection
to the condensate
trap,
c. Determine
appropriate
length,
cut. and connect
tube.
d. Clamp
tube to prevent
any condensate
leakage.
3. Relief Port Tube
a. Extend
collector
box tube (green
label)
which
was previ-
ously connected
to the condensate
trap by splicing
to small
diameter
tube (factory-supplied
in loose parts
bag).
b. Route extended collector box pressure tube to relief port
connection on the condensate
trap.
c. Determine appropriate length, cut, and connect tube.
d. Clanlp tube to prevent any condensate leakage.
CONDENSATE
TRAP
FIELD
DRAIN
ATTACHMENTS
Refer
to
Condensate
Drain
section
for recommendations
and
procedures.
PRESSURE
SWITCH
TUBING
The LOWER
collector
box pressure
tube (pink label)
is factory
connected
to the High Pressure
Switch
for use when
furnace is
installed
in UPFLOW
applications.
This tube MUST
be discon-
nected,
extended,
rerouted,
and then reconnected
to the pressure
switch
in HORIZONTAL
LEFT
applications
for 060
and 080
heating
input furnaces.
NOTE:
See Fig. 10 or tube routing
label on main furnace
door to
check
for proper
connections.
Modify
tube as described
below:
1. Disconnect
collector
box pressure
tube (pink label) attached
to
High Pressure
Switch.
2. Use smaller
diameter
tube
I, f actory-supplied
in loose
parts
bag) to extend
tube disconnected
in item
i.
3. Route extended
tube:
4.
a. Behind
inducer
housing.
b. Between
blower
shelf
and inducer
housing.
Determine
appropriate
length,
cut. and reconnect
tube to High
Pressure
Switch
connection
labeled
COLLECTOR
BOX.
10

Advertisement

loading