Huawei CX210 White Paper page 15

Switch module
Table of Contents

Advertisement

Huawei CX210 Switch Module
White Paper
l
l
Figure 1-5 Mapping between the CX210 and mezz modules on compute nodes
Compute Node
The following describes the mapping between the CX210s and mezz modules. For example, the
CX210s are installed in slots 2X and 3X and connect to Mezz 1.
Port Mapping Between a Switch Module and a Mezz Module
Mapping between the CX210 and ports on the MZ220
The two 16G FC ports (ports 1 and 2) on the MZ220 map to the FC switching planes of the
CX210s in slots 2X and 3X respectively, as shown in
Issue 01 (2014-09-15)
Mezz 1 connects to the FC switching planes of the CX210s in slots 2X and 3X.
Mezz 2 connects to the FC switching planes of the CX210s in slots 1E and 4E.
Mezz1
Mezz2
NOTE
If a compute uses the ports provided by four mezz modules to connect to the CX210, slots Mezz1 and
Mezz3 connect to switch module slots 2X and 3X respectively, and slots Mezz2 and Mezz4 connect to
switch module slots 1E and 4E respectively.
NOTE
The two 10GE ports on the MZ910 are automatically negotiated to GE ports to connect to the CX210 GE
switching plane.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1 About This Document
1E
8X8G FC
FC
2X
8X8G FC
FC
3X
8X8G FC
FC
4E
8X8G FC
FC
Figure
1-6.
12

Advertisement

Table of Contents
loading

Table of Contents