Mounting Installation; Removal From The Carrier - NPK PH1 Operator's Manual

Ph series hammers
Hide thumbs Also See for PH1:
Table of Contents

Advertisement

MOUNTING INSTALLATION

NPK Mounting Installation Kits include the parts required to adapt the NPK HYDRAULIC
HAMMER to the carrier.
mounting pins (optional), flow control valve (optional), and hoses to connect to the
carrier hydraulic system (optional).
BACKHOES and EXCAVATORS
SKID STEERS
NPK Mounting Installation Kits for skid
steers include parts required to adapt the
NPK
HYDRAULIC
carrier.
NPK mounting kits include the
hammer mounting bracket (m7), and
hoses (m3 and m4) to connect to the
carrier hydraulic system. The flow control
valve (ma3) is optional.

REMOVAL FROM THE CARRIER

BACKHOES and EXCAVATORS
1. Close pressure and return line shut-off
valves (k4) if available.
2. Disconnect hydraulic hoses (m3 and
m4) before laying the hammer down.
3. Cap the pressure and return lines on
the carrier and connect the hammer
whip hoses to the hammer bracket.
4. Position the hammer (DR) horizontal
on wood blocks (t20) and remove stick
(m1) and link (m2) pins.
NPK mounting kits include the hammer mounting bracket,
HAMMER
to
the
- 15 -
AF
Hex Head Cap Screw (if required)
g20
Male Adapter (if required)
m12
Hex Nut (if required)
DXm
Male Quick Disconnect (if required)
DXf
Female Quick Disconnect (if
required)
m1
Stick Pin (if required)
m2
Link Pin (if required)
m3
(Whip) Pressure Hose
m4
(Whip) Return Hose
m7
Top Bracket
m8
Hammer Bolt Package
m9
Klik Pin (if required)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ph2Ph4Ph3

Table of Contents