6
Mounting the Front Carrier
Frames
Parts needed for this procedure:
2
Carrier frame
2
Spacer
2
Bolt (1/2 inch x 3-1/4 inch)
2
Locknut (1/2 inch)
Procedure
1. Mount a carrier frame assembly to each clevis with a
spacer, 1/2 x 3-1/4 inch bolt and 1/2 inch locknut
(Figure
8). Torque to 91–113 N-m (67–83 ft/lb).
1. Carrier frame
2. Spacer
3. Clevis
2. Lubricate the bushings in each carrier frame with No.
2 general-purpose lithium-based grease.
Figure 8
4. Bolt (1/2 x 3-1/4 inch)
5. Locknut, 1/2 inch
7
Adjusting the Carrier Frame
Rollers
No Parts Required
Procedure
1. Position the machine on a level surface and lower the
cutting unit carrier frames to the floor.
2. Verify that there is 13 mm (1/2 inches) clearance
between the carrier frame rollers and the floor.
3. If an adjustment is required, loosen the jam nut on the
carrier frame stop screw
up or down to raise or lower the carrier frame. Tighten
the jam nut after adjustment is attained.
1. Carrier frame roller
17
(Figure
9) and rotate the screw
Figure 9
2. Carrier frame stop screw