Maintenance - Joannes EPOCA 25-29 NS Installation And Maintenance Manual

Wall-hung gas instantaneous condensing boiler
Table of Contents

Advertisement

59

MAINTENANCE

To remove the casing front panel (1) and acceed to the internal components, it is first necessary to remove the
plastic front panel (2)* and open the conmtrol board (3)*.
Undo the screws (4) and remove the casing panel (1) fixed to the sides by four small pins.
If the lower closing panel (5) is to be removed, it is necessary to undo the four screws (6), doing this with care
as the screws hold the lower closing panel.
4
4
1
3
2
6
6
6
6
5
NOTE: To remove the plastic front panel and open the control board see paragraph "Wiring diagrams",
page 48.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents