Download Print this page

Potterton NXR5i Assembly Instructions Manual page 55

Fuel oil/gas boilers
Hide thumbs Also See for NXR5i:

Advertisement

67
Package MR338, MR339, MR3 to MR5.
Package FA10 to FA11.
Place the side covers (package FA10 - FA11, MR3 to MR5, see table) from the front to rear.
They have the same lengths as the side panels.
Boiler type
Front
NXR5i-14
800
NXR5i-15
940
NXR5i-16
1050
NXR5i-17
940
NXR5i-18
1050
NXR5i-19
940
NXR5i-20
940
NXR5i-21
1050
NXR5i-22
940
NXR5i-23
1050
NXR5i-24
940
NXR5i-25
1050
400 mm long panel in package FA10
600 mm long panel in package FA11
Cover packages
800 mm long panel in package MR3
940 mm long panel in package MR4
1050 mm long panel in package MR5
25/09/2012 - 300029104-001-02
Central and boiler side covers (mm)
<----------------------------------->
600
600
600
600
600
600
600
400
400
600
400
400
600
600
400
600
600
600
600
600
600
600
600
400
600
600
400
600
600
600
600
600
600
Rear
400
400
400
400
NXR5i
C003947-A
55

Advertisement

loading