Download Print this page

Potterton NXR5i Assembly Instructions Manual page 29

Fuel oil/gas boilers
Hide thumbs Also See for NXR5i:

Advertisement

27
Assembling the return flange on boilers NXR5i-14 to NXR5i-25
NXR5i-14:
NXR5i-14
Package FA 49
Package FA68
Fit the boiler return flange, intercalating a seal Ø 170x222 previously soaked in tepid water.
Fit the heating return flange with a Ø 170x222 gasket in between and fix it with 4 nuts H 18.
NXR5i-15 to NXR5i-25:
=Package FA50 to FA60
=Package FA69 to FA79
Fit the water balancing tube onto the boiler return with a Ø 170x222 gasket in between (first soak the gasket in warm water).
Fit the heating return flange with a Ø 170x222 gasket in between (first soak the gasket in warm water) and fix it with 4 nuts H 18
Boiler type
NXR5i-15, NXR5i-16
NXR5i-17 to NXR5i-19
NXR5i-20 to NXR5i-22
NXR5i-23 to NXR5i-25
25/09/2012 - 300029104-001-02
Length mm
380
600
880
1210
NXR5i
C003941-A
29

Advertisement

loading