Daikin FXFQ25SVM Installation Manual page 14

Hide thumbs Also See for FXFQ25SVM:
Table of Contents

Advertisement

Power supply wiring/
earth wiring
[Power supply wiring, Earth wiring]
Sheathed
part
Earth
wiring
13
Wiring penetrating
hole (high voltage)
Printed Circuit
Board
Clamp (4)
L
N
R10
or more
Earth terminal
[Remote controller wiring, Transmission wiring]
Prohibited
• Do not connect the power supply wiring (high voltage).
Remote
controller wiring
Sheathed part of
remote controller wiring,
transmission wiring
Approx.
7 mm
Strand the
wirings after
sheath is
70 - 90 mm
peeled off.
(Sheath peeling
off allowance.)
Terminal block for
power supply wiring/
earth wiring (3P)
After the
Wiring diagram label
wirings are
(on backside of control box lid)
clamped, cut
off the extra
part.
Fig. 23
Transmission
wiring
P1 P2 F1 F2 T1 T2
Forced
10 - 15 mm
off
R10
or more
Clamp (4)
After the wirings are clamped,
cut off the extra part.
Transmission
wiring
Wiring
penetrating
hole (low
Remote
voltage)
controller wiring
Terminal block for
remote controller wiring/
transmission wiring (X1M)
Control box lid
3P335596-2D
English

Advertisement

Table of Contents
loading

Table of Contents