B Ackground A Ctivities; V Iewing C Urrent B Ackground A Ctivities - Promise Pegasus2 R6 Product Manual

Table of Contents

Advertisement

Pegasus2 R4/R6/R8 Product Manual
m
AnAging
Background activity management includes:
• "Viewing Current Background Activities"
• "Adding a Scheduled Background Activity"
• "Changing a Background Activity Schedule"
• "Enabling or Disabling a Scheduled Background Activity"
• "Deleting a Scheduled Background Activity"
• "Media Patrol"
• "Redundancy Check"
• "Initialization"
• "Rebuild"
• "Migration"
• "PDM"
Background activities perform a variety of preventive and remedial functions on your physical drives,
disk arrays, logical drives, and other components.
You can run a background activity immediately or schedule it to run at a later time. Scheduling options
are described below.
Setting options for each activity are listed after the scheduling options. These settings determine how
the background activity affects I/O performance.
b
Ackground
A
ctivities
36

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pegasus2 r4Pegasus2 r8

Table of Contents