•
Connect an extension bar to any IEC-320-C19 receptacle to
yield seven additional IEC-320-C13 receptacles.
Connecting the UPS cord retention clips
Charging the UPS batteries
With the UPS in Standby mode, allow the batteries to charge before
putting the UPS into service.
IMPORTANT: Charge the batteries for at least 24
hours before supplying backup power to devices. The
batteries charge to:
•
80 percent of their capacity within 3 hours
•
100 percent of their capacity within 48 hours
Starting power to the load
Start power to the load by placing the UPS in Operate mode.
IMPORTANT: AC power must be available the first
time the UPS is started.
Connecting the battery leads
WARNING: To prevent personal injury from electric
shock or damage to the equipment, remove the battery
lead labels before connecting the battery leads.
Installing the extension bars (if
included)
Connecting and securing the power cords
Configuring the UPS Network
Module
NOTE: For more information about the UPS Network
Module, see the HPE Infrastructure Management Pack
software CD and documentation for complete details.
Before configuring the UPS Network Module, be sure that the
network cable is connected.