Before start-up operators and other personnel must be familiar with the safety
regulations given in this manual.
1. Place the grinder in the area where work is to begin.
2. Check the main power cable and the dust hose for damage. Replace or repair all
damaged parts before starting the machine.
3. Connect the grinder and the filter unit with the dust hose.
4. Connect the supply cable of the PM200 with the site supply. Make sure that the correct
electric supply is available.
5.2
Initial Operation
All persons near the machine must wear safety glasses with lateral protection,
ear protection as well as safety shoes. The operator is obliged to wear close
fitted protective clothing.
Before start-up the operating personnel must be familiar with the safety regulations given in
this manual.
Attention! Before you plug the equipment to a power supply make sure the
power supply is equivalent to the data shown on the machine label.
The start of the grinder and the filter unit is affected in the following sequence:
1. Switch on the filter unit.
2. Adjust speed of motor on keypad.
3. Press start and immediately begin moving machine side-to-side or in a straight line.
Failure to move machine immediately will leave gouges in the flooring surface.
4. To shut down machine, press the red "stop" key on keypad.
Do not overfill the bin to avoid dust exposure when opening the bin. Comply
with the local waste treatment regulations considering the removed material.
Operating Manual
PM200
15