Starting Up The Machine - Prep/Master PM200 Operating Manual

Edger
Table of Contents

Advertisement

PM200
Operating Manual

5.0 Starting Up the Machine

5.1
Preparing for Initial Operation
5.2
Initial operation
5.1
Preparing for Initial Operation
Before start up ensure all existing protective housings are fitted and the filter unit is
connected correctly.
All persons in the proximity of the machine must wear safety glasses with lateral
protection as well as safety shoes. The operator is obliged to wear close-fitting
protective clothing.
Carefully handle all plugs, cables, hoses, and operating devices. Avoid any contact
with live wires.
Work on the electrical system has to be done only by qualified specialists.
Check the surface to be treated; it should be free of for loose parts (stones, screws,
etc.). The surface needs sweeping if necessary. Ensure that the machine can run over all
inequalities on the surface. Small inequalities like floor joints aren't a barrier for the machine.
In order to avoid downtimes a regular inspection is essential. Carry out the
following checks before any start-up:
• Check whether all machine parts are assembled safely
and correctly.
• Check all screws and other fasteners for tight seat.
• Check the tool holders to ensure that the proper tools are in
place and secure.
• Check the tightness of the hose connections and the
condition of the hose to the filter.
• Make sure the dust container of the filter unit is empty.
Please comply with the local waste treatment regulations
considering the removed material.
• Check the electrical connections for dirt and foreign
body deposits.
• Check the electrical motors for dirt and other contaminants.
14
• Adjustment Rod
• Adjustment Knob to
level the head

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PM200 and is the answer not in the manual?

Table of Contents