Baxi Mainfour 24-24F Operating And Installation Instructions page 48

High performance gas-fired wall-mounted boilers
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 27
Figure 18
Legend:
1 Boiler drain tap
2 Boiler filling tap
3 Water pressure switch
4 Gas valve
5 Gas train with injectors
6 Water-fumes exchanger
7 NTC domestic hot water sensor
8 Fumes conveyor
9 Fumes thermostat
10 Central heating NTC sensor
INSTRUCTIONS FOR FITTERS
24
Heating
DHW
Gas
delivery
outlet
DHW
Heating
inlet
return
11 Ignition / flame detection electrode
12 Burner
13 Expansion vessel
14 Safety thermostat
15 Pump and air separator
16 Pressure gauge
17 Safety valve
18 Automatic by-pass
19 DHW priority sensor
48
71.07144.01 - EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents