Unpacking And Inspection; Pre-Installation Information; Installation Instructions - OSCO VS-GSLG Installation Manual

Table of Contents

Advertisement

VS-GSLG OPERATOR INSTALLATION GUIDE
VS-GSLG OPERATOR INSTALLATION GUIDE
VS-GSLG OPERATOR INSTALLATION GUIDE
VS-GSLG OPERATOR INSTALLATION GUIDE
VS-GSLG OPERATOR INSTALLATION GUIDE
Before unpacking check the carton for exterior damage. If you find damage advise the deliverer of a potential claim.
If any of the following parts are missing from the carton, immediately notify your supplier. Claims for shortages will be honored
for only 30 days from the date of shipment:
(1) VS-GSLG Operator
(1) Chain in Box
(1) Hardware Box Containing:
Before installing the VS-GSLG, read this manual completely to ensure all requirements for proper installation are present.
Verify that the voltage to be used matches the voltage of the operator.
IMPORTANT:
The gate must operate properly to assure trouble-free installation. Before installing the gate operator to the
gate, make sure the gate's slide is free and unobstructed. If the gate doesn't seem to operate properly, it may
affect the operator performance or greatly shorten the life of the unit.
NOTE:
These instructions are for an operator on the right side of the opening, when viewed from the inside looking out. Left-
hand installation is simply transposed.
LOCATING AND INSTALLING POSTS
LOCATING AND INSTALLING POSTS
LOCATING AND INSTALLING POSTS
LOCATING AND INSTALLING POSTS
LOCATING AND INSTALLING POSTS
Locate and secure two galvanized posts (3" ID, 3 1/2" OD; see
drawing #2700-152). Embed the posts in concrete to a depth
required by local code or below the frost line.
OPERATOR INSTALLATION
OPERATOR INSTALLATION
OPERATOR INSTALLATION
OPERATOR INSTALLATION
OPERATOR INSTALLATION
Attach the operator to the posts using the U-Bolts and side
plates provided (see drawing #2700-223). The operator can be
adjusted vertically to suit; 12" to 18" from the bottom of the idler
sprockets (chain line) would be normal. See drawing #2700-152
for additional installation information.
CHAIN BRACKET INSTALLATION
CHAIN BRACKET INSTALLATION
CHAIN BRACKET INSTALLATION
CHAIN BRACKET INSTALLATION
CHAIN BRACKET INSTALLATION
Slide the gate to the fully closed position. Secure the chain
bracket on the vertical post of the back frame with the chain bolt
level with the bottom of the idler sprockets.
Slide the gate to the fully open position and secure the front
chain bracket on the front vertical post of the gate. Once again,
the chain bolt hole should be level with the bottom of the idler
sprockets.

UNPACKING AND INSPECTION

UNPACKING AND INSPECTION
UNPACKING AND INSPECTION
UNPACKING AND INSPECTION
UNPACKING AND INSPECTION
(2) Gate Brackets
(4) 3" U-Bolts
(4) 4" U-Bolts
(2) 3/16" Side Plates
(2) 1/2" Side Plates
(2) 1/2" Chain Bolts

PRE-INSTALLATION INFORMATION

PRE-INSTALLATION INFORMATION
PRE-INSTALLATION INFORMATION
PRE-INSTALLATION INFORMATION
PRE-INSTALLATION INFORMATION

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS
(1) Hardware Bag Containing:
(2) #50 Master Link
(16) 3/8" Hex Nuts
(16) 3/8" Lock Washers
(16) 3/8" Flat Washers
(2) Springs (heavy)
(4) 1/2" Hex Nuts
(2) 1/2" Flat Washers
(4) 3/8"-16 x 3/4" Square Head Set Screw
A SEPARATE PEDESTRIAN GATE IS
REQUIRED FOR ALL PEDESTRIAN TRAFFIC.
THIS GATE MUST BE A MINIMUM DISTANCE
OF SEVEN (7) FEET FROM THE VEHICULAR
GATE AND THE GATE OPERATOR
- 4 -
- 4 -
- 4 -
- 4 -
- 4 -
Drawing #2700-223
5-03-3

Advertisement

Table of Contents
loading

Table of Contents