Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Commissioning steps
Inspection steps
Maintenance steps
and flue pipe.................................................................... 11
6. Checking all gaskets and packing cords on the flue
gas side
7. Checking the thermal insulation components on the
boiler door
10. Checking connections and sensor well for leaks on
the heating water side
13. Checking the firm seating of electrical plug-in
connections and cable grommets
14. Checking the thermal insulation
tightness.......................................................................... 17
18. Checking the function of the return temperature
raising facility (if installed)
19. Checking the installation room ventilation
20. Checking the flue pipe for tightness
Commissioning, inspection, maintenance
Page
9
7