Making Drinks; Switching On; Before Preparing The First Drink; Filling The System With Water - Miele CVA 3660 Operating And Installation Instructions

Built-in coffee machine
Table of Contents

Advertisement

Important: the water piping must be
rinsed through every day before the
first drink of the day is prepared.
Rinsing will take place automatically
if the machine is cold. Hot water will
run out of the spout into the drip tray
once the machine has heated up.

Switching on

^ Touch the On/Off sensor s.
The following message will then
appear:
Heating-up phase
Once the machine has heated up, the
following message will appear:
Water will run out of the spout.
You will hear the capsule carousel
moving into position.
The main menu will then appear in the
display:
COSI
K1 K2 K3 K 4 K5 L
Rinsing
o Espresso
o n G k C

Before preparing the first drink

Filling the system with water

The machine is emptied completely
before it leaves the factory. You must
allow water to be pumped through the
system before the first drink of coffee or
hot water is prepared.
Hot water
K1 K2 K3 K 4 K5 L
^ Select "Hot water" with one of the
arrow sensors.
^ Touch the OK sensor.
^ Run some hot water into the cup.
^ Touch the OK sensor again to switch
the water off.
The system is now filled with water, and
the machine is ready to use.

Preparing espresso and coffee

^ Place a cup under the spout.
COSI
K1
K2 K3 K 4 K5 L
^ Select the type of coffee with one of
the arrow sensors.
^ Use the drink selection sensor to
select espresso or coffee.
The type of coffee you have chosen
will appear in the top line of the
display on the right.

Making drinks

n G k C
o
o Espresso
o n G k C
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents