Dirna DINAMIC 1.1 bycool Mounting Instructions page 32

Hide thumbs Also See for DINAMIC 1.1 bycool:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 18
DINAMIC 1.1
EN
GAS LOAD:
Empty the circuit for at least 30 minutes.
17
Introduce 300 g of gas load R134a and start
18
up the equipment.
GENERAL VIEW OF THE
19
CONDENSATION UNIT AND PIPING.
GENERAL VIEW OF THE
20
EVAPORATION UNIT.
32
dirna
, s.a.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents