Installation/Performance Checklist - Nordyne TE Series 95 Installation Instructions Manual

Gas fired central furnaces
Table of Contents

Advertisement

INSTALLATION/PERFORMANCE CHECK LIST
LOCATION ____________________________ CITY _____________________STATE _______
INSTALLER ___________________________ CITY _____________________STATE _______
UNIT MODEL # ________________________ UNIT SERIAL # __________________________
Minimum Clearances per Table 3? _________
Electrical Connections tight? ______________
Line Voltage Polarity correct? _____________
Supply Voltage: ____________________ Volts
Blower Motor HP: _______________________
FUEL TYPE:
Natural Gas _______ LP/Propane _________
Gas Piping Connections leak-tested? _______
Gas Line Pressure: _____________________
(in. water column, with furnace operating)
Manifold Pressure: ______________________
(in. water column, with furnace operating)
Is there adequate fresh air supply for
combustion and ventilation? ______________
Furnace Input: __________________
Supply Air Temperature: ____________ (° F)
Return Air Temperature:_____________ (° F)
O'Fallon, MO
Temperature Rise: _________________ (° F)
Are Flue Connections tight? ______________
Is there Proper Draft? ___________________
Is Vent free from restrictions? _____________
Is the Filter(s) secured in place? ___________
Is the Filter(s) clean? ____________________
Has the Thermostat been calibrated? _______
Is the Thermostat level? _________________
Is the Heat Anticipator Setting correct? ______
Has the Owner's Information been reviewed with
the home-owner? _______________________
Has the Literature Package been left near the
furnace? _____________________________
(Btuh)
¢708766R¤
708766A
708766A (Replaces 7087660)
Specifi cations and illustrations subject to change
without notice and without incurring obligations.
Printed in U.S.A. (11/07)

Advertisement

Table of Contents
loading

Table of Contents