Installation/Performance Checklist - Nordyne *TE Series Installation Instructions Manual

Te series 95+ upflow/horizontal two-stage furnace for iqdrive systems
Table of Contents

Advertisement

INSTALLATION/PERFORMANCE CHECK LIST
LOCATION __________________________ CITY ____________________ STATE _____
INSTALLER _________________________ CITY ____________________ STATE _____
UNIT MODEL # ______________________ UNIT SERIAL # ________________________
Minimum Clearances per Table 3? _______
Electrical Connections tight? _____________
Line Voltage Polarity correct? ____________
Supply Voltage: ___________________ Volts
Blower Motor HP: _____________________
FUEL TYPE:
Natural Gas _______ LP/Propane ________
Gas Piping Connections leak-tested? ______
Gas Line Pressure: ____________________
(in. water column, with furnace operating)
Manifold Pressure: ____________________
(in. water column, with furnace operating)
Is there adequate fresh air supply for
combustion and ventilation? _____________
Furnace Input: __________________
O'Fallon, MO
Supply Air Temperature: ____________ (° F)
Return Air Temperature: ____________ (° F)
Temperature Rise: ________________ (° F)
Are Flue Connections tight? _____________
Is there Proper Draft? __________________
Is Vent free from restrictions? ____________
Is the Filter(s) secured in place? __________
Is the Filter(s) clean? __________________
Has the Thermostat been calibrated? ______
Is the Thermostat level? ________________
Is the Heat Anticipator Setting correct? ____
Has the Owner's Information been reviewed
with the home-owner? __________________
Has the Literature Package been left near the
furnace? ____________________________
(Btuh)
¢708679e¤
7086790
Specifications and illustrations subject to change
without notice and without incurring obligations.
Printed in U.S.A. (12/06)
7086790

Advertisement

Table of Contents
loading

This manual is also suitable for:

Te060Te080Te100Te120

Table of Contents