SW10JM INSTALLATION – FLOOR APPLICATION
FLOOR APPLICATION – COMPLETE INSTALLATION
New/Existing Construction
1. Use template to determine a suitable installation
location. Place the SW10JM cardboard template
in the desired location making sure the template
is level and aligned correctly. You may want to
staple the template in place for added ease.
2a. Measure the width between the joists/studs and
cut two 2 X 4s to match this width. The 2 X 4s
will be used to cross brace between joists.
2b. Position each 2 X 4 according to
template. Attach each 2 X 4 to the
floor joists using applicable local
building methods.
3a. Mark 4 hole locations from template. This area
will be used for the grille cutout.
3b. Cut thru sub-flooring (OSB, PLYWOOD, ETC.)
between marks using appropriate tools.
10
Template
Template
X Minimum
X
Width Needed
➊
➋
Hole Cut-out
(CONTINUED ON NEXT PAGE)
Floor
X Minimum
Width Needed
2 x 4
Frame Cut-out
➌
➍
Bottom View