Unpacking And Checking The Cabinet - NEC Express 5800/320Fd Read Me First

Nec corporation of america servers owner manual
Table of Contents

Advertisement

present, see the section
on page 19
When shipped, the system cabinet is tied to the pallet beneath it.
The pallet has a clearance for a pallet jack to move the unit. When
moving a system cabinet, follow these guidelines:
1. Verify that the unpacked cabinet is still secured to the pallet.
2. Use a pallet jack to move the cabinet on its pallet to the
installation site.
!
C A U T I O N
Use a pallet jack to move the packaged cabinet,
not a forklift. Using a forklift could damage the
cabinet or a system. Use the pallet jack at the
front or rear of the cabinet.
3. Position the cabinet pallet so that it has the clearances shown
in
Figure
4.

Unpacking and Checking the Cabinet

Unless you have a service agreement that includes installation of
the system, you need to unpack the cabinet.
To unpack the cabinet
Make sure you have the correct tools.
Remove the packing materials.
Check the cabinet and system.
Verify the system serial numbers.
Remove the cabinet from its pallet.
"Stabilizing the Systems"
for stabilization guidelines.
-7-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/320fd

Table of Contents