Relevant Installation, Service And User Manuals; Disposal; Regulations And Guidelines - Rinnai E75CN Installation & Servicing Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

1.7 Relevant Installation, Service and User manuals

– Approved vent system
– Rinnai Boiler Applications Manual
– User manual

1.8 Disposal

– Dispose of the boiler packaging in an environmentally sound manner.
– Dispose of components of the heating system (e.g. boiler or control device), that
2

Regulations and guidelines

The installation must comply to the requirements of the authority having jurisdiction
or, in the absence of such requirements, to the latest edition of the National Fuel Gas
Code, ANSI Z223.1/NFPA 54. In Canada, installation must be in accordance with
the requirements of CAN/CSA B149.1, Natural Gas and Propane Installation Code.
Where required by the authority having jurisdiction, the installation must comply to
the Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
Install CO detectors per local regulations. Boiler requires an inspection every 2 years or
4000 hours and maintenance every 4 years or 8000 hours. See maintenance section
chapter 13.
Operating Limits of the boiler:
The hot water distribution system must comply with all applicable codes and
regulations. When replacing an existing boiler, it is important to check the condition
of the entire hot water distribution system to ensure safe operation.
must be replaced in an environmentally responsible manner.
Max. boiler temperature: 176 °F (80.0 °C)
Max. operating pressure: 45 psi (3 bar)
Max. Allowable Working Temperature ASME: 200 °F (93 °C)
Max. Allowable Working Pressure ASME: 45 psi (3 bar)
7

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

E75cpE110cnE110cp

Table of Contents