B) Mounting The Device - SGM IDEA SPOT 250 User Manual

Table of Contents

Advertisement

SGM Technology for Lighting

b) Mounting the device

The installation of the effect has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate safety
cable.
Never stand directly below the device when mounting, removing or servicing the fixture.
The operator has to make sure the safety relating and machine technical installations are approved by an
expert before taking the device into operation for the first time.
These installations have to be approved by a skilled person once a year.
Cautions:
The effect should be installed outside areas where persons may reach it, walk by or be seated.
Overhead mounting requires extensive experience, including amongst others calculating
working load limits, installation material being used, and periodic safety inspection of all
installation material and the device. If you lack these qualifications, do not attempt the
installation yourself. Improper installation can result in bodily injury.
Before mounting make sure that the installation area can hold a minimum point load of 10 times the
device's weight.
Connect the fixture to the mains with the power plug.
WIT070 V1.0-01NR
Pleas consider the EN 60598-2-17 and the other respective
national norms during the installation. The installation must
only be carried out by a qualified person.
Before taking into operation for the first time, the
installation has to be approved by an expert.
When installing the device, make sure there in no highly
inflamm able material within a distance of min. 0,5m
The electric connection must only be carried out by a
qualified electrician.
CAUTION
CAUTION
CAUTION
CAUTION
6
GB
Idea Spot 250

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents