CONSIDERATIONS FOR INSTALLATION
The installation and testing operations must be performed solely by qualified personnel in order to
guarantee the proper and safe operation of the automatic gate.
The company declines any responsibility for damage caused by incorrect installations due to
incompetence and/or negligence.
Before assembling the automatism, check that the gate is in perfect working order, hangs well on its
hinges and is suitably lubricated. It must also comply with the safety standards in force in the country of

installation.

6
INSTALLATION
Introductory note: Dig a hole big enough to hold the foundation box, calculate the required opening angle,
insert the sheath for laying the power cable and that for laying the limit switch cables (where applicable),
make water drainage holes in the ground and cement the box solidly.
6.1

GATE WING OPENING ANGLE

6.1.1 Establish the required opening angle
Pillar
Internal view
Pillar
Internal view
Box
position
Box
position
7