Savannah Heating BL21 Installation And Operating Instructions Manual page 32

Elite linear fireplace 21,000 btu
Table of Contents

Advertisement

Vertical Installations
Always maintain a 1" clearance around the vent pipe (vertical) and 1" clearance horizontal, when passing
through ceilings, walls, roofs, enclosures, attic rafter or any combustible surfaces.
DO NOT PACK AIR SPACES WITH INSULATION
NE PAS PACK ESPACES D'AIR AVEC ISOLATION
When passing through a flat ceiling install a Box/Wall thimble. Cut a 9" square hole and frame as shown in
the diagram below.
9" x 9" opening
ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING. CLEARANCES ETC,
MAY VARY FROM STATE TO STATE (PROVINCE TO PROVINCE).
TOUJOURS vérifier les codes locaux avant l'installation VENTILATION. ETC DÉGAGEMENTS, peut
varier d'ÉTAT (PROVINCE).
CONSULT DURAVENT PARTS LIST OR INCA METAL CUTTING'S FIREPLACE MANUFACTURING
PARTS LIST FOR PART NUMBERS.
FOYER Duravent CONSULT LISTE DES PIÈCES OU COUPE METAL INCA de fabrication LISTE
DES PIÈCES DE RÉFÉRENCE.
See section 3.3.4 Venting for instructions on how to connect Security or Dura-vent
venting.
Page 32 of 57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blst21

Table of Contents