Mitsubishi 3000GT 1994 Workshop Manual page 571

Hide thumbs Also See for 3000GT 1994:
Table of Contents

Advertisement

STEERING
-
Power Steering Gear
Box
37 A-17
POWER STEERING GEAR BOX
GAUTION:
SRS
Before removal of
steering
gear box,
referto
GROUP
52B-
SRS,
centerfront
wheels and
tcmovs
ignition
kev.
Failureto
do
so
may damage
SRS
clock spring and
render
SRS
system inoPerative,
risking serious
driver iniury.
Post-installation Operation
o
Installation
of
Transfer
Assembly
(Referto
GROUP 22
-Transfer.)
o
Installation
of
Front Exhaust
Pipe
(Refer
to GROUP
15
-
Exhaust
Pipe
and Main
Muffler.)
o
Supplying of
the
Power Steering
Fluid
(Refer
to
P.374-9.)
o
Bleeding of
the
Power Steering
Fluid
Line
(Refer
to
P.374-10.)
o
Checking of Steering
Wheel
Position
with
Wheels Straight Ahead
o
Adjustment
of
the
Front
Wheel
Alignment
(Refer
to
GROUP 33A
-
Service
Adjustmenr
Procedures.)
50
Nm
5.0
kgm
36
ft.lbs.
60-70Nm
6.0
-
7.0
kgm
43
-
51
ft.lbs.
35
Nm
3.5
25ft
60-70
Nm
6.0
-
7.0
kgm
'ß -
51
ft.lbs.
7
15Nm
1.5
kgm
rl
ftlb.
12
Nm
1.2
kgm
8
ft.lbs.
1.8
kgm
13
ft.lb!.
RemovalstePs
1. Joint assembly
and gear box
connecting bolt
2.
Cotter
pin
ef
3.
Tie-rod end and
knuckle connecting nut
4.
Left
member
5.
Right
member
6.
Stabilizer
bar
bracket
7.
Connection of steering
gear box
with 4WS
oilline
8.
ClamP
er>
)e
9.
Gear box
assembly
)e
10. Mounting rubber
REMOVAL
AND
INSTALLATION
Pre-removal
Operation
o
Draining
of
the
Power Steering
Fl
(Refer
to
P.374-9.)
o
Removal
of
Front Exhaust
Pipe
(Refer
to
GROUP
15
-
Exhaust
Pipe
and Main
Muffler.)
o
Removal
of Transfer
Assembly
(Referto
GROUP
22
-Transfer.)
@
Mitsubishl'Motorr
Corporadon
May
199i1
PWUEgl19

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents