Pump - IDEAL isar HE24 Installation And Servicing

Hide thumbs Also See for isar HE24:
Table of Contents

Advertisement

back
69 CONDENSATE 'S' TRAP REPLACEMENT
1. Refer to Frame 57.
2. Remove the casing front & bottom panel.
Refer to Frames 49 & 50.
3. Swing the control box down into the servicing
position. Refer to Frame 51.
4. Disconnect the condensate drain pipe.
5. Remove the securing screw and elongated bolt,
pull the trap down and forward to remove.
6. Transfer the drain pipe to the new trap and
reassemble in reverse order.
7. When reassembling ensure the trap is full of water.
8. Check operation of the boiler. Refer to Frame 57.
70 DHW THERMISTOR REPLACEMENT
1. Refer to Frames 57 & 77 for draining the appliance.
2. Remove the casing front & bottom panel.
Refer to Frames 49 & 50.
3. Remove the 4 screws securing the support plate and
withdraw the plate.
Note.
The M4 screws fit the casing and the self-tapping
screws fit the plastic pump and valve housings.
4. Withdraw the securing pin.
5. Disconnect the electrical lead.
6. Ease out the sensor and discard.
7. Fit the new sensor, ensuring silicone grease is applied
to the 'O' ring.
M4 screw
Support plate
48
SERVICING
8. Refit the securing pin.
9. Reassemble in reverse order, ensuring correct location
of screws in support plate, and that tabs on the pump
and valve housings engage in slots.
10. Check operation of the boiler. Refer to Frame 57.
Self tapper
screw
M4 screw
Discharge pipe
Securing pin
Sensor
isar -
Electrical lead
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isar he35He30

Table of Contents

Save PDF