Appliance Break-In; Heat Management - Quadra-Fire GARN-MBK-IPI Owner's Manual

Table of Contents

Advertisement

F. Appliance Break-In
Initial Break-in Procedure
• The fireplace should be run three to four hours
continuously on high.
• Turn the fi replace off and allow it to completely cool.
• Remove fi xed glass assembly. See Section 4.B.
• Clean fi xed glass assembly. See Section 4.B.
• Replace the fi xed glass assembly and run continuously
on high an additional 12 hours.
This cures the materials used to manufacture the fi re-
place.
NOTICE! Open windows for air circulation during fi re-
place break-in.
• Some people may be sensitive to smoke and odors.
• Smoke detectors may activate.
G. Heat Management
Heat Output
This model has a variable burn rate which is controlled
by the HI/LO switch on the control module. Therefore the
fl ame height is adjustable. The HI/LO switch is shown in
Figure 3.6. It is located in the control cavity of the appli-
ance.
If a remote control is installed, the fl ame height may also
be controlled by the remote, if fl ame height is a function
of that particular model of remote control.
If an optional fan is installed, the fan speed is controlled
by adjusting the speed control knob.
clockwise to increase the fan speed and counterclockwise
to decrease the fan speed.
10
Quadra-Fire • GARN-MBK-IPI, GARN-D-PMH-IPI, GARN-D-MBK-IPI, GARN-D-CSB-IPI Owner's Manual • 2345-981 • 5/14
Turn the knob

Advertisement

Table of Contents
loading

This manual is also suitable for:

Garn-d-pmh-ipiGarn-d-csb-ipiGarn-d-mbk-ipi

Table of Contents