Ignition - Biasi Advance Plus 25C ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for Advance Plus 25C ERP:
Table of Contents

Advertisement

Fig. 2.2
If you experience any difficulty with the
operation of the boiler, switch off the
boiler immediately at the fused spur iso-
lation switch and contact your Installer
or an approved Service Engineer.
Air introduced into the boiler during this fill-
ing process will vent through the automatic
air purger fitted to the boiler. You may also
find it necessary to vent air from your radia-
tor circuit using your radiator key, however
be aware that excessive venting will cause
the pressure in the system to drop.
Always ensure that the pressure gauge is
set at the required pressure.
2.3

Ignition

• Check that the valves located in the lower
part of the boiler are open Fig. 2.3.
INSTRUCTIONS FOR USE
Open
position
Fig. 2.3
• Turn on the electricity supply to the boil-
er, switching on the fused spur isolation
switch. The LCD display displays the state
within which the boiler is found (last mem-
orised) Fig. 2.4.
Fig. 2.4
C.h. / D.h.w. functioning
• Press the key 14 for 2 seconds until both
and
symbols appear on the
display Fig. 2.5.
Stand-by
Winter
°C
Summer
°C
- 13 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advance plus 35c erpAdvance plus 30c erp

Table of Contents